How to Calculate Concrete for a Slab

Measure slab length, width, and thickness, then convert the resulting volume to cubic yards with a clearly stated waste allowance.

Last reviewed: November 11, 2026

The short answer

A slab’s concrete quantity is set by the space between the top of the forms and the ground, so the number that matters is the average depth you actually measure, not only the thickness on the drawing. Measure the footprint, sample the depth at several points, find the average, and then convert.

Use the Concrete Slab Calculator

Measure the ground before you measure the slab

Do this once the forms are set and the base is prepared, because it is the only moment the real depth is visible.

  1. Set the form height

    The top of the forms is the finished surface. Every depth is measured from that line.

  2. Measure depth on a grid

    Take readings every few feet in both directions, and extra readings near edges where ground tends to be lower.

  3. Average the readings

    Add the depths and divide by the number of readings. Use this average as the thickness.

  4. Multiply by the footprint

    Footprint area times average depth in feet gives cubic feet.

  5. Convert and add the allowance

    Divide by 27 for cubic yards, then apply the allowance once.

Average-depth formula

Average depth = sum of readings ÷ number of readings
Cubic feet = footprint area × average depth (in) ÷ 12
Cubic yards = cubic feet ÷ 27

A slab that slopes evenly can be handled with two readings: the average of the high edge and the low edge.

Worked example: a 14-by-10-foot slab on uneven ground

The drawing says 4 inches. Six depth readings measured from the top of the forms are 3.5, 4, 4.5, 4, 4.5, and 5 inches. The planning allowance is 5%.

  1. Average depth: 25.5 ÷ 6 = 4.25 in
  2. Footprint: 14 × 10 = 140 ft²
  3. Volume: 140 × 4.25 ÷ 12 = 49.58 ft³
  4. With 5%: 49.58 × 1.05 = 52.06 ft³ = 1.93 yd³

Result: A flat 4 inch slab would be 46.67 cubic feet. The measured ground adds about 2.9 cubic feet, roughly 6%, before the allowance.

Edges and thickened perimeters

Some slab designs are deeper around the edge. Treat the thicker band as extra concrete under the perimeter. For the 14 ft by 10 ft slab, a 1 ft wide band has an area of 140 minus the inner 12 ft by 8 ft rectangle (96), which is 44 square feet. If the band is 8 inches deeper than the field, it adds 44 × 8 ÷ 12 = 29.33 cubic feet.

The depth and width of any thickened edge come from the plan or the person designing the slab. The slab calculator takes the band as four extra rectangles.

Checks before you order

Slope
If the top is pitched for drainage over a flat base, the high side is thicker. Average the two edges.
Form dimensions
Measure inside the forms, which is the space the concrete fills.
Base material
Gravel under the slab is a separate order. Use the gravel calculator for it.
Units
Label feet and inches on your notes, because an unlabeled thickness is a common source of large errors.

Slab questions

Does this method determine slab thickness?

No. Thickness, reinforcement, and base come from the project plan, site conditions, and local requirements.

What if the ground is much lower in one corner?

Add readings near that corner, or treat the low area as its own rectangle with its own average depth.