How Much Gravel Do I Need?
Turn layer area and depth into cubic yards of gravel, allow for compaction and edges, and convert to tons using your supplier’s figure.
Last reviewed: November 11, 2026
The short answer
Gravel is ordered by volume or by weight, but you can only calculate volume from measurements. Multiply the area of each layer by its depth, add the layers, apply an allowance for compaction and edges, and convert to cubic yards. Then ask your supplier how many tons are in a cubic yard of the exact product you chose.
Use the Gravel CalculatorVolume first, weight second
People often ask for the number of tons of gravel, but tons depend on the stone. A cubic yard of one product can weigh noticeably more than a cubic yard of another, and wet stone weighs more than dry stone. Because of that, a calculator that gives you only a tonnage would be hiding an assumption. The reliable order of work is to calculate volume from your own measurements, then ask the supplier for that product’s weight per cubic yard.
The volume calculation is the same one used for concrete and mulch: length times width times depth. What changes with gravel is that depth is usually a design decision about a layer, and that layer gets compacted after it is placed.
Decide what each layer is for
A project may use more than one stone, each with its own depth and area. Calculate them separately.
- Base layer
- A compacted layer under pavers, a slab, or a walkway. It is usually the deepest layer and covers the whole footprint, often with a margin beyond the finished edge.
- Surface layer
- A top layer of a different, finer or decorative stone. It is usually thin, so a small error in depth is a large share of the volume.
- Drainage fill
- Stone placed in a trench or behind a wall. Its depth and width come from your drainage plan, and the length is measured along the run.
Gravel volume formulas
Layer volume (ft³) = length (ft) × width (ft) × depth (in) ÷ 12 Ordered volume = sum of layers × (1 + allowance % ÷ 100) Cubic yards = cubic feet ÷ 27 Tons = cubic yards × tons per cubic yard (from the supplier)
Convert depth from inches to feet by dividing by 12. Apply the allowance once, to the total.
Worked example: a parking strip with a base and a top layer
A parking strip is 24 ft long and 10 ft wide. The plan shows a 6 inch base layer and a 2 inch surface layer. The allowance is 15% to cover compaction and trimming.
- Area: 24 × 10 = 240 ft²
- Base: 240 × 6 ÷ 12 = 120 ft³
- Surface: 240 × 2 ÷ 12 = 40 ft³
- Total: 120 + 40 = 160 ft³
- With 15%: 160 × 1.15 = 184 ft³ = 6.81 yd³
Result: You would order about 4.44 cubic yards of base stone and 1.48 cubic yards of surface stone before allowance, or 6.81 cubic yards in total with a 15% allowance applied to both. If you place the allowance on each layer separately, the result is the same.
Why compaction matters
Loose gravel is full of air. Once it is compacted, the layer is thinner than it was when you spread it. If your plan calls for 6 inches compacted, you must spread more than 6 inches of loose stone to end up there. The size of that difference depends on the stone and the method, so rather than guess, ask the supplier or installer what allowance they use, and put that number in the calculator.
The reverse mistake is also common. If you measure the depth of loose stone that is already on site and treat it as the finished depth, you may under-order.
Extra area at the edges
A finished surface is rarely cut off exactly at its edge. A base often extends beyond the finished area, and slopes at the sides take up room. If the 24 ft by 10 ft strip in the example had a base that extended 6 inches beyond each side, the base area would be 25 ft by 11 ft, or 275 square feet. At 6 inches, that is 137.5 cubic feet instead of 120, an increase of about 15% from the footprint alone.
That is why the allowance should come from the actual layout rather than a rule of thumb. Sketch the base outline, measure it, and use that area.
Converting to tons
Ask the supplier: how many tons per cubic yard for this product, as sold? As an illustration only, if a supplier quoted 1.4 tons per cubic yard, the 6.81 cubic yards in the example would be about 9.5 tons. A different product or moisture content would change that figure, so use your supplier’s number.
Some suppliers sell by the ton and some by the cubic yard. Knowing the conversion lets you compare quotes fairly. Also confirm the delivery method, since truck capacity and access to your site can limit how much arrives in one trip.
Mistakes to avoid
- Mixing up inches and feet
- A 6 inch layer is 0.5 ft. Entering 6 as feet gives a number twelve times too large.
- Counting the allowance twice
- If you inflate the depth for compaction and also add a percentage, you are doubling up.
- Ignoring the stone type
- Base stone, drainage stone, and decorative stone differ in size and use. Choose the product from your plan, not from the quantity.
- Forgetting a second layer
- A thin top layer over a large area adds up. Two inches over 240 square feet is 40 cubic feet.
A quick check you can do in your head
Before trusting any result, estimate it by hand. A cubic yard is 27 cubic feet, and one square foot at 1 inch deep is 1/12 of a cubic foot, so one cubic yard covers 324 square feet at 1 inch. Divide that by the depth in inches to get the coverage at your depth: 162 square feet at 2 inches, 81 at 4 inches, 54 at 6 inches.
For the 240 square foot strip at a total of 8 inches, that is 240 × 8 ÷ 324 = 5.93 cubic yards before the allowance, which agrees with the 160 cubic feet (5.93 cubic yards) in the example. If your hand estimate and the calculator disagree by a large factor, a unit is probably wrong.
Gravel questions
How deep should the gravel be?
It depends on the use, the soil, and local requirements. Use the depth on your plan or recommended by your installer or supplier. The calculator only turns depth into volume.
Is a ton the same as a cubic yard?
No. They are different units, one of weight and one of volume. The relationship depends on the product, so ask your supplier.
Which calculator should I use?
The gravel calculator for general layers, or the crushed stone calculator when the project is a base or a drainage trench.